{"id":89324,"date":"2026-04-10T09:20:43","date_gmt":"2026-04-10T07:20:43","guid":{"rendered":"https:\/\/cualimetal.com\/adjudicacion-de-nave-metalica-prefabricada-3600m2-fuerteventura-islas-canarias-espana\/"},"modified":"2026-04-10T09:25:05","modified_gmt":"2026-04-10T07:25:05","slug":"contract-awarded-for-a-3600-m%c2%b2-prefabricated-steel-warehouse-fuerteventura-canary-islands-spain","status":"publish","type":"post","link":"https:\/\/cualimetal.com\/en\/contract-awarded-for-a-3600-m%c2%b2-prefabricated-steel-warehouse-fuerteventura-canary-islands-spain\/","title":{"rendered":"Contract awarded for a 3,600 m\u00b2 prefabricated steel warehouse. Fuerteventura (Canary Islands, Spain)"},"content":{"rendered":"<p data-start=\"228\" data-end=\"404\">Cualimetal has been awarded a new project in <strong data-start=\"273\" data-end=\"307\">Fuerteventura (Canary Islands)<\/strong> for the construction of an <strong data-start=\"335\" data-end=\"401\">ECORAPID\u00ae series industrial building of approximately 3,600 m\u00b2<\/strong>.<\/p>\n<p data-start=\"406\" data-end=\"660\">This project will be developed using a <strong data-start=\"445\" data-end=\"476\">modular construction system<\/strong>, allowing optimized assembly times and providing an <strong data-start=\"529\" data-end=\"578\">efficient, durable and robust steel structure<\/strong>, adapted to the client\u2019s needs and the requirements of each industrial project.<\/p>\n<p data-start=\"662\" data-end=\"810\">The <strong data-start=\"666\" data-end=\"688\">ECORAPID\u00ae solution<\/strong> stands out for its versatility and speed of execution, making it an ideal option for large-scale industrial facilities.<\/p>\n<p data-start=\"812\" data-end=\"1020\">With this new project, Cualimetal continues to expand its activity in the <strong data-start=\"886\" data-end=\"904\">Canary Islands<\/strong>, taking part in large-scale developments and delivering construction solutions adapted to different environments.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cualimetal has been awarded a new project in Fuerteventura (Canary Islands) for the construction of an ECORAPID\u00ae series industrial building of approximately 3,600 m\u00b2. This project will be developed using a modular construction system, allowing optimized assembly times and providing an efficient, durable and robust steel structure, adapted to the client\u2019s needs and the requirements [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":88233,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[195],"tags":[],"class_list":["post-89324","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2026-2"],"acf":[],"_links":{"self":[{"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/posts\/89324","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/comments?post=89324"}],"version-history":[{"count":2,"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/posts\/89324\/revisions"}],"predecessor-version":[{"id":89336,"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/posts\/89324\/revisions\/89336"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/media\/88233"}],"wp:attachment":[{"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/media?parent=89324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/categories?post=89324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cualimetal.com\/en\/wp-json\/wp\/v2\/tags?post=89324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}