Industrial metallic building. 600m2. Penonomé (Panama)
Industrial prefabricated warehouse of ECORAPID series completed.
Main and secondary structure composed of galvanised and cold-formed profiles.
Metal roof and facades made of corrugated sheet metal.
Industrial modular warehouse for the largest photovoltaic plant in Central America.
Assembly of the metallic building with local staff.




