Features of the MECARAPID® metal modular building
WIDTH
Up to 40 metres wide for the standard-sized structure.
HEIGHT
No maximum building height.
CENTRE-TO-CENTRE
Modular structure with centre to centre distance from 7 metres.
ROOFS
Adaptable structure to single or double pitched roofs.
Advantages of the MECARAPID® metal modular building
COST-EFFECTIVENESS
- MECARAPID® prefabricated and modular buildings are offered at a quoted price to the customer beforehand. Fixed and affordable price.
12%
Average SAVINGS compared to conventionally structured halls of similar characteristics and dimensions.
SPEED
- These are modular structures designed and developed by our Engineering department, manufactured in our workshop using our own technology, and assembled by our installation team.
- Their hot-rolled columns welded in the workshop and its trusses made of lightweight cold-formed profiles, combined with a 100% bolted metal structure, reduce the assembly time to less than 4 weeks.
- The structures can also be assembled by the customer’s own personnel using simple assembly manuals.
QUALITY
- The MECARAPID® brand is a registered and patented product that complies with all international quality requirements and certifications (CE Marking, ISO 9001, UKCA, CFO Registration, etc.).
- Modular buildings with a standard galvanized metal structure that is 100% bolted.
- Structure treated for fire resistance, with metal roofing and façades.
- System compatible with the installation of an overhead crane.
VERSATILITY
- 100% demountable structures.
- Prefabricated modular structures that can include custom finishes based on customer needs. Wide range of finishes, accessories and extras.
- Structures that can be assembled on any type of terrain.
- Structures that can be adapted to any industrial warehouse need.
ECORAPID range of colours for prefabricated metal building enclosures
EXPORT
- Thanks to their modular nature and lightweight metal structure, MECARAPID® modular buildings can be transported simply and cost-effectively, reducing logistics costs.
PHASE 1: PROJECT STUDY
- Study of the project by the Commercial Department and Technical Office (calculation of the building).
- Acceptance of the budget.
- Deadline: From 2 weeks.
PHASE 2: DESIGN
- Further study by our engineering department
- Calculation, modelling and design of the vessel
- Deadline: 2 to 3 weeks
PHASE 3: MANUFACTURING
- Fabrication of the structure in our workshop
- Preparation of the project
- Deadline: From 4 weeks
PHASE 4: SUPPLY
- We ship the materials along with assembly drawings and manuals.
- The client can assemble the structure using local personnel or their own team.
PHASE 5: ASSEMBLY
- We send our own assembly teams,
- Or a supervisor to support the development of the project.