CUALIMETAL products

MECARAPID® – Modular open-plan industrial buildings and warehouses

Features of the MECARAPID® metal modular building

MECARAPID® modular buildings are large-span structures designed to cover the larger spans that the ECORAPID® system cannot, with the versatility of “custom-made” buildings or conventional industrial buildings.

WIDTH

Up to 40 metres wide for the standard-sized structure.

HEIGHT

No maximum building height.

CENTRE-TO-CENTRE

Modular structure with centre to centre distance from 7 metres.

ROOFS

Adaptable structure to single or double pitched roofs.

Advantages of the MECARAPID® metal modular building

COST-EFFECTIVENESS

  • MECARAPID® prefabricated and modular buildings are offered at a quoted price to the customer beforehand. Fixed and affordable price.
12%

Average SAVINGS compared to conventionally structured halls of similar characteristics and dimensions.

SPEED

  • These are modular structures designed and developed by our Engineering department, manufactured in our workshop using our own technology, and assembled by our installation team.
  • Their hot-rolled columns welded in the workshop and its trusses made of lightweight cold-formed profiles, combined with a 100% bolted metal structure, reduce the assembly time to less than 4 weeks.
  • The structures can also be assembled by the customer’s own personnel using simple assembly manuals.

QUALITY

  • The MECARAPID® brand is a registered and patented product that complies with all international quality requirements and certifications (CE Marking, ISO 9001, UKCA, CFO Registration, etc.).
  • Modular buildings with a standard galvanized metal structure that is 100% bolted.
  • Structure treated for fire resistance, with metal roofing and façades.
  • System compatible with the installation of an overhead crane.

VERSATILITY

  • 100% demountable structures.
  • Prefabricated modular structures that can include custom finishes based on customer needs. Wide range of finishes, accessories and extras.
  • Structures that can be assembled on any type of terrain.
  • Structures that can be adapted to any industrial warehouse need.
gama colores ecorapid

ECORAPID range of colours for prefabricated metal building enclosures

EXPORT

  • Thanks to their modular nature and lightweight metal structure, MECARAPID® modular buildings can be transported simply and cost-effectively, reducing logistics costs.
nave industrial 1094 001 00 portada

Prefabricated industrial buildings. 12,000m2 Acajutla (El Salvador)

nave industrial 1560 001 00 portada

Modular metal building. 7.292m2. Chalchuapa (El Salvador)

nave industrial 1402 001 00 portada

Prefabricated industrial building. 5820m2 San Pedro de Macorís (Dominican Republic)

nave industrial 991 001 00 portada

Prefabricated steel industrial building MECARAPID. 3600m2 Calatayud (Zaragoza)

nave industrial 1204 001 00portada

Modular Industrial steel buildings. 3000m2 El Ejido (Almería)

00 PORTADA 20

Prefabricated industrial building with metal structure. 2,900 m² Port of Ferrol (Galicia, Spain)

nave industrial 874 001 00 portada

Prefabricated industrial building MECARAPID. 2340m2 Puebla (Mexico)

nave industrial 1342 001 00 portada

Prefabricated steel warehouses. 2220m2 Alajuela (Costa Rica)

nave industrial 1448 001 00 portada

Modular steel warehouse. 2160m2 Saint Germain de Lusignan (France)

nave industrial 731 001 0 portada

Industrial building modular large spans MECARAPID

nave industrial 1367 001 0 portada

Modular steel warehouse. 1800m2 Cherves-Richemont (France)

nave industrial 1229 001 00portada

Galvanized steel structure. 700m2 El Ejido (Almería)

  • PHASE 1: PROJECT STUDY

    • Study of the project by the Commercial Department and Technical Office (calculation of the building).
    • Acceptance of the budget.
    • Deadline: From 2 weeks.
  • PHASE 2: DESIGN

    • Further study by our engineering department
    • Calculation, modelling and design of the vessel
    • Deadline: 2 to 3 weeks
  • PHASE 3: MANUFACTURING

    • Fabrication of the structure in our workshop
    • Preparation of the project
    • Deadline: From 4 weeks
  • PHASE 4: SUPPLY

    • We ship the materials along with assembly drawings and manuals.
    • The client can assemble the structure using local personnel or their own team.
  • PHASE 5: ASSEMBLY

    • We send our own assembly teams,
    • Or a supervisor to support the development of the project.

QUOTE REQUEST