Information, Projects, and Quotes.

  • PHASE 1: PROJECT STUDY

    • Study of the project by the Commercial Department and Technical Office (calculation of the building).
    • Acceptance of the budget.
    • Deadline: From 2 weeks.
  • PHASE 2: DESIGN

    • Further study by our engineering department
    • Calculation, modelling and design of the vessel
    • Deadline: 2 to 3 weeks
  • PHASE 3: MANUFACTURING

    • Fabrication of the structure in our workshop
    • Preparation of the project
    • Deadline: From 4 weeks
  • PHASE 4: SUPPLY

    • We ship the materials along with assembly drawings and manuals.
    • The client can assemble the structure using local personnel or their own team.
  • PHASE 5: ASSEMBLY

    • We send our own assembly teams,
    • Or a supervisor to support the development of the project.