We design and manufacture custom steel mezzanines and industrial mezzanine floors tailored to the specific requirements of each project. Our solutions allow businesses to maximize their available space by creating additional storage, production, office or working areas without the need to expand their existing facilities.
Our steel mezzanines are ideal for warehouses, factories, logistics centers and industrial buildings where structural modifications are not possible or where construction work must be kept to a minimum. Thanks to their modular steel construction, they can be adapted to future operational needs while minimizing installation time and disruption.
Advantages of Steel Mezzanines and Industrial Mezzanine Floors
- Increase usable space: create one or multiple additional levels to maximize floor space and significantly increase storage or production capacity without extending the building footprint.
- Cost-effective solution: installing a steel mezzanine floor is considerably more economical than constructing a building extension. Since no major foundations are required, installation costs and project times are substantially reduced.
- Engineered for safety: all mezzanines are professionally engineered to comply with applicable structural standards and are designed to support heavy industrial loads safely and efficiently.
- Fast installation and future flexibility: our structures are manufactured using fully bolted steel connections, allowing for fast installation, easy dismantling and future relocation or expansion whenever operational requirements change.
PHASE 1: PROJECT STUDY
- Study of the project by the Commercial Department and Technical Office (calculation of the building).
- Acceptance of the budget.
- Deadline: From 2 weeks.
PHASE 2: DESIGN
- Further study by our engineering department
- Calculation, modelling and design of the vessel
- Deadline: 2 to 3 weeks
PHASE 3: MANUFACTURING
- Fabrication of the structure in our workshop
- Preparation of the project
- Deadline: From 4 weeks
PHASE 4: SUPPLY
- We ship the materials along with assembly drawings and manuals.
- The client can assemble the structure using local personnel or their own team.
PHASE 5: ASSEMBLY
- We send our own assembly teams,
- Or a supervisor to support the development of the project.