Modular building. 600m2 Durango (Mexico)
Modular industrial building for warehouse in Mexico.
Assembly of prefab building in 8 days by local teams.
Galvanized structure without need of maintenance.
Modular building transported in 1 container.
Turn-key project carry out by local distributor.




