Photovoltaic park. 440KW. Gelsa (Spain)
Modular metal tables from the RAPIDSOL series ended.
Main and secondary structure composed of galvanised and cold-formed profiles.
Installed power 440KW.
Assembly of the solar metal structure by client staff.
Modular metal tables from the RAPIDSOL series ended.
Main and secondary structure composed of galvanised and cold-formed profiles.
Installed power 440KW.
Assembly of the solar metal structure by client staff.