Prefabricated industrial building. 600m2 Bissau (Guinea-Bissau)
ECORAPID prefabricated industrial building completed.
Main and secondary metal structure based on cold-formed and galvanized profiles.
Simple metal roof formed by corrugated sheet of galvanized steel.
Simple metal facades formed by galvanized steel.
Asembly of the modular prefabricated warehouse with client staff.




