Start assembly of the project “Waste Treatment Plant” 10.500m2 Malta
Start construction of metal buildings for industrial waste treatment center 10.500m2 Malta.
Assembly stages of metal structure.
Metal structure manufacture according CE marking, fully bolted and removable. Construction industrial buildings with Cualimetal staff.




